Construction site operations with mini crane, glass suction unit and glassworker

Uplifter is involved in the architectural project THE SPIN in Frankfurt am Main! The 128 meter high skyscraper is expected to be completed in April 2023. Learn more now about the technology used, special developments and concepts - from the early construction phase to the glazing on the 31st floor.
This is where it gets really tight! The glass lifter used a mini crane to get to the 1st floor of a residential building near Würzburg: Millimeter work for the GW1125 glass worker. A sure instinct and experience are required here!
Large construction site at the NKP in Bonn: Uplifter is live on site with the revolutionary working beast, the Glassworker GW1125. See exclusive footage from the construction site here.
Uplifter sets trends. Right at the forefront: the GW425 glassworker in the construction of the new paddle tennis court at the RheinEnergieSTADION of the 1st FC Cologne.
Outdoor use for the Uplifter Glassworker: passing between narrow walls and over cobblestones to the job site.
Uplifter Glassworker in use on buses and trains. Prototype development and special machine construction at Uplifter convinces. Learn more about glass replacement with the Uplifter lifting robot now.
The redesign of the exhibition in the Altonaer Museum in Hamburg is on the agenda. The Glassworker GW295, which was specially developed for indoor applications, provides powerful lifting support. Our Glassworker went from floor to floor quite comfortably in the passenger elevator.